Septic Tank Replacement For School

Project: Septic Tank Replacement For School Date: July 2013 Location:  Co. Kildare System Type: bioCycle™ 48,000 Series System Design: “Fit for Purpose” & Local Authority Planning Requirements     Description: A major extension was being built on a national school in Co. Kildare. The site was serviced by an existing malfunctioning septic tank system…

Read More

Commercial Wastewater Treatment System Commercial bioCycle™ System & Pump Station for Oil Refinery

Project: Installation of Commercial bioCycle™ System & Pump Station for Oil Refinery Date: September 2015 Location: Co. Cork System Type: bioCycle™ BAF Wastewater System         System Design:  The BioCycle wastewater treatment system has been designed based on the maximum hydraulic and organic loadings detailed below: The plant has…

Read More

Defective Building Regulations

Re: Defective Building Regulations Dear Deputy, Thank you for raising the consumer and environmental protection issues. The Ministerial responses to questions raised confirm that the Minister is being misled and poorly advised. It also suggests that his Department has no plans to amend the defective Building Regulations to provide for…

Read More

Replacement of an Existing Wastewater Treatment System

Project: Replacement of an Existing Wastewater Treatment System and installation of a new soil polishing filter. Date: July  2015 Location: Domestic Dwelling, Malahide, Co.Dublin System Type: bioCycle™ 12,000 Series System Design: “Fit for Purpose” & Local Authority Requirements Description: The homeowner bought a house only discover numerous problems with the existing treatment system and that…

Read More

Septic Tank Grants

Currently in Ireland there are only two options for financial assistance when upgrading or repairing your septic tank system:   Domestic Waste Water Treatment Systems (Financial Assistance) Regulations 2013 (S.I. No. 222 of 2013) Home Renovation Incentive (HRI) Scheme     Domestic Waste Water Treatment Systems (Financial Assistance) Regulations 2013…

Read More

Upgrade of an existing Malfunctioning Wastewater Treatment System

Project: Design & Upgrade of an existing malfunctioning sequential batch reactor wastewater treatment system serving a Bar and Restaurant. Installation of a new sand polishing filter. Date: March 2015 Location: Bar/Restaurant, Co. Westmeath System Type: Upgraded to BAF treatment system System Design: Effluent quality of 20 mg/l BOD and 30…

Read More